project
in progress

watch this space

Project Due: Q2 2024

HASTINGS

The Int. Workspaces Project Team were engaged to advise and design an office layout that would initially accommodate 10 staff with the ability to expand the team in the open office area at a later date. It was discussed during the initial client consultations that it was important to create a modern and comfortable space for both staff and their clients who are visiting. We achieved this by utilising furniture with plants, an assortment of soft seating, acoustic panels, and an office quiet pod.

“It is critical for us to be involved as early as possible during a project so we can assist with general layout and product specification. We work closely with our clients’ builders and trades to ensure we have understood power and data requirements and make sure they will be in the right places whether it is for Height Adjustable Pods or Boardroom Tables”

The staff kitchen area was important for our client as they wanted a space that felt removed from the office and had a relaxing and inviting feel.

“We understand workspaces and the importance of ergonomics and workplace wellbeing, and the products specified in this project reflect this” – Josh Hill, Int. Project Team

Consultation of this project began in January 2024, and it is expected to be delivered Q2 2024.

Once our client has approved the office layout, we then establish furniture requirements and specifications. We do this by understanding our client’s business, how the space is going to be used and of course the client’s budget to ensure we can supply and install fit for purpose products.

The final stage before signoff is product finishes, whether it be Melteca, Veneer, Solid Wood, Powdercoat, Acoustic Panels and our endless fabric options for soft seating and screens.

The Project Team will then work alongside our client and their contractors to ensure all our products are manufactured to a high standard, delivered, assembled, and installed within the project timeline, and commissioned by our own install team – this ensures a seamless fitout from start to finish.

products we've used for this Project

TOP

SHOPPING CART 0